This week MultiFit is in Islip, NY with Royal Pavement Solutions, fitting a new Mini Line dual grade system on a Carlson CP100-II. The growing commercial paving contractor saw the need to add grade control technology to their paving operation to assist the crew during the paving process.
The grade controls were installed in less than an hour, and the crew was utilizing the system shortly thereafter. The video attached demonstrates how quickly the crew became acclimated to and began using the system. The video is of only the 4th pass of the large 4500 ton paving project.
For more information how you can integrate Mini Line systems into your paving process contact:
www.multifitllc.com or call 816-788-0415